Performance and User Statistics

Home   About   Investigators   Areas of Research   Publications   Products   More Information   Performance   Feedback  


The Duke Forest FACE site operates as a DOE User Facility. Core funding for the User Facility has been provided by the Office of Science (BER), U.S. Department of Energy.

User Facility Statistics for 2005

Month Scheduled
Hours
Operating
Hours
Operating Time
(% of Scheduled)
On-site
Primary Users
On-site
Post-Docs
and Grads
Data
Status
December, 2005 176 176 99.9% 15 14 Final
November, 2005 285 283 99.6% 19 17 Final
October, 2005 359 359 99.8% 20 20 Final
September, 2005 396 395 99.8% 22 28 Final
August, 2005 443 442 99.8% 22 22 Final
July, 2005 472 471 99.8% 20 19 Final
June, 2005 465 463 99.6% 20 20 Final
May, 2005 460 459 99.8% 19 17 Final
April, 2005 395 395 99.5% 17 15 Final
March, 2005 288 287 99.7% 18 12 Final
February, 2005 216 215 99.6% 9 11 Final
January, 2005 169 169 99.8% 14 13 Final

Notes

Scheduled hours are the total number of daylight hours (solar altitude > -6°) when ambient temperature was > 5° C and average wind speeds just above the canopy were < 5 m sec-1. Occasional periods when the CO2 was deliberately turned off for specific scientific studies are excluded from these totals.
Operating hours are scheduled hours when the CO2 exposure system was adding CO2 to the treatment plots, averaged across all treatment plots.
On-site users are the number of principal investigators and co-investigators who were physically present at the FACE site in the given month, or who had technicians, post-docs, and graduate students working on the site. The tally does not include investigators analyzing samples or data from the site in their home laboratory.


This website is designed and maintained by Yavor Parashkevov