User Facility Statistics for 2006

Month Scheduled
Hours
Operating
Hours
Operating Time
(% of Scheduled)
On-site
Primary Users
On-site
Post-Docs
and Grads
Data
Status
December, 2006 272 271.7 99.9% 16 8 Final
November, 2006 287.7 287.1 99.8% 15 8 Final
October, 2006 355.5 354.9 99.8% 14 11 Final
September, 2006 395.6 394.6 99.8% 16 15 Final
August, 2006 445.3 444.1 99.7% 17 12 Final
July, 2006 473.1 458.3 99.8% 19 12 Final
June, 2006 466.0 464.7 99.7% 18 9 Final
May, 2006 465.0 463.8 99.7% 17 16 Final
April, 2006 410.6 402.5 98.0% 15 9 Final
March, 2006 330.5 330.1 99.9% 16 12 Final
February, 2006 207.6 207.4 99.9% 10 11 Final
January, 2006 277.0 276.1 99.7% 15 9 Final

Notes

Scheduled hours are the total number of daylight hours (solar altitude > -6°) when ambient temperature was > 5° C and average wind speeds just above the canopy were < 5 m sec-1. Occasional periods when the CO2 was deliberately turned off for specific scientific studies are excluded from these totals.
Operating hours are scheduled hours when the CO2 exposure system was adding CO2 to the treatment plots, averaged across all treatment plots.
On-site users are the number of principal investigators and co-investigators who were physically present at the FACE site in the given month, or who had technicians, post-docs, and graduate students working on the site. The tally does not include investigators analyzing samples or data from the site in their home laboratory.


This website is designed and maintained by Yavor Parashkevov